View Single Post
Old 07-05-2016, 12:45 PM   #2
bob in canmore
Advanced Member III
 
Join Date: Aug 2004
Location: Canmore, AB, Canada
Posts: 347
Default Re: HAL & Main Lobby

Hi Mark-

I have 2 systems running HAL and ML in parallel. They used to be on the same machine, but now a NUC runs ML at one site and HAL at the other. I primarily use touch screens to run ML, ipads mostly but it will run on anything the way my supplier has set it up.

http://shore2shore.ca/

ML runs most of it with HAL answering the phone and doing the schedule stuff.

I too would like to know the level of interaction. Are the systems synergistic or, as I am thinking, antagonistic?

ML will have scheduling soon and I don't know the applicability of HAL in that scenario. There must be a higher level of integration.

PM me if you want details.

Anyone else out there? See my original post.

bob
bob in canmore is offline   Reply With Quote